Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of astroland drainage improvement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Design/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Seguin is soliciting bids for Phase II drainage improvements along Mays Creek. The work includes constructing a single‑span arch structure, modular block retaining walls, and channel widening, along with associated roadway and drainage features. Bids are due January 13, 2026 at 3:00 PM CST via the City’s BidNet Direct portal.
Posted Date
Oct 29, 2025
Due Date
Jan 13, 2026
Release: Oct 29, 2025
Close: Jan 13, 2026
The City of Seguin is soliciting bids for Phase II drainage improvements along Mays Creek. The work includes constructing a single‑span arch structure, modular block retaining walls, and channel widening, along with associated roadway and drainage features. Bids are due January 13, 2026 at 3:00 PM CST via the City’s BidNet Direct portal.
AvailableProject will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Project will include the replacement of approx. 340 LF of 48" cmp with new 7'x3' RCBC between open drainage channels behind 2831 and 2816 flintridge drive. The 7'x3' RCBC installation will vary between 9-14' deep and will require active shoring approved by a professional engineer.
AvailableThe work consist of approx 4,262 FT curb removed; 1,242 FT 24" pipe removed; 107 FT 20" RCP fill and plug existing conduit; 675 CY excavation; 5,096 SY seeding and mulching; 182 FT 24" conduit; 350 FT full depth pavement sawing;.
Posted Date
Jul 9, 2025
Due Date
Jan 12, 2026
Release: Jul 9, 2025
Close: Jan 12, 2026
The work consist of approx 4,262 FT curb removed; 1,242 FT 24" pipe removed; 107 FT 20" RCP fill and plug existing conduit; 675 CY excavation; 5,096 SY seeding and mulching; 182 FT 24" conduit; 350 FT full depth pavement sawing;.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →