Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide 20 EA of installation of asphalt speed hump (infrared heating technology); 20 EA of temporary traffic control (one per speed hump location). Also includes installation of 9 speed lumps; provide and install all signs and barricades for detours. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking for the installation services of asphalt speed humps on various county roads, on an as-needed basis. The county desires to enter into a contract with a contractors capable of addressing the county's annual need to have, on average, twenty to twenty-five speed humps installed, and to provide additional speed hump installations as needed.
Posted Date
Oct 17, 2025
Due Date
Jan 19, 2026
Release: Oct 17, 2025
Close: Jan 19, 2026
Seeking for the installation services of asphalt speed humps on various county roads, on an as-needed basis. The county desires to enter into a contract with a contractors capable of addressing the county's annual need to have, on average, twenty to twenty-five speed humps installed, and to provide additional speed hump installations as needed.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Greenville County (SC) issued RFQ #26062 seeking qualified contractors to provide asphalt speed hump installation services on county roads on an as-needed basis, with an expected annual volume of about 20–25 installations and a one-year base term plus up to four annual renewals. Qualifications are to be submitted through the County’s procurement portal; the RFQ includes licensing, insurance, bonding, equipment, schedule, and reference requirements. Key deadlines: release December 31, 2025, question deadline January 9, 2026 at 3:00pm ET, and qualifications due January 19, 2026 at 3:00pm ET (solicitation is not a grant and was open as of 2026-01-01).
Posted Date
Dec 31, 2025
Due Date
Jan 19, 2026
Release: Dec 31, 2025
Close: Jan 19, 2026
Greenville County (SC) issued RFQ #26062 seeking qualified contractors to provide asphalt speed hump installation services on county roads on an as-needed basis, with an expected annual volume of about 20–25 installations and a one-year base term plus up to four annual renewals. Qualifications are to be submitted through the County’s procurement portal; the RFQ includes licensing, insurance, bonding, equipment, schedule, and reference requirements. Key deadlines: release December 31, 2025, question deadline January 9, 2026 at 3:00pm ET, and qualifications due January 19, 2026 at 3:00pm ET (solicitation is not a grant and was open as of 2026-01-01).
AvailableWork includes install asphalt, soil cement base course, striping reflectors, drainage pipe, asphalt speed lumps, parking lot improvements and all other incidentals associated with this work. Includes 200 CY of general excavation; 300 CY of embankment A-4 (shoulders and roadways); 100 TN of additional portland cement; see outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work includes install asphalt, soil cement base course, striping reflectors, drainage pipe, asphalt speed lumps, parking lot improvements and all other incidentals associated with this work. Includes 200 CY of general excavation; 300 CY of embankment A-4 (shoulders and roadways); 100 TN of additional portland cement; see outside link.
AvailableInfrared breath testing system and related equipment, warranty and repair.
Posted Date
Nov 17, 2025
Due Date
Jan 30, 2026
Release: Nov 17, 2025
Close: Jan 30, 2026
Infrared breath testing system and related equipment, warranty and repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →