Summary
Work includes execute the complete removal, disposal, grading, and replacement of degraded asphalt surfaces at the designated district sites, including all necessary sub-base preparation, striping, and site cleanup, in strict accordance with project specifications and safety standards. Includes mill down 2" and replace 2" of asphalt on the entire campus; replace any broken curbs where needed, campus wide including backfill (if needed); replace sub base as needed, stripe lanes, parking spots/lines, arrows, ADA compliance, crosswalks etc. Campus wide. Includes 1 LS of crack fill and 1 LS of full depth asphalt repair.