Summary
One section on county road 10 x 250-Starts halfway down county road-Mill & pave One section on Michigan Ave South, above St Albans bridge, where the drain was replaced. 12 x 30, two inches of base (It's marked), then apply two inches of topcoat on the total existing length of 12 x 110 (It's marked) One section on Dupont south above the St. Albans bridge, 16 x30 two-inch base (It's marked), then two-inch topcoat the entire length of 16 x 110-(it's marked) Kanawha Ave at the end of Kapok St, that has never been paved-14 x 240-three inches of base (priority) Ivy St from Main Ave to Dupont Ave- 14 x 238-Mill and pave 15th east on 3rd Ave – pave 15th St to 17th St 15 x 360-Mill & pave Top of Short St, one large section (priority)13 x 310-Mill and pave 9th St entrance from 1st Ave 16 x 20 and from house number 921 to the top of the bank and flare out-26 x 180 (PRIORITY)-Mill and pave 12th St entrance 32 x 24-Mill and pave 12th St from house number 1223 to 1232 – 26 x 193-mill two inches and replace two inches (PRIORITY) 15th St from 2nd Ave 26 x36-mill two inches replace two inches -house number 1505 -27 x 160 to house number 1505-excavate or mill 10 inches full depth area and install 6 inches of stone-replace with 2.05 base and 1.5 top (PRIORITY) 16th St at top, starting at house number 1635 at the end of the garage, and flare out to the wall on 3rd Ave-16 x 5O – Mill and pave 19th St at crossing end at 2nd Ave one large section – 10 x 32 – Mill and pave 20th St from 2nd Ave to the end of the Frontier Building-38 x 330-mill two inches, replace two inch wearing 22nd St from 1st Ave back to new pavement-number 24 x 100-Mill and pave 23rd St from 1st Ave to 2nd Ave-32×390 mill and pave 24th St turn around 48 x 5O-priority marked with steel pegs-one large gravel area 25th St from 1st Ave up to construction ends-30 x 170-Mill and pave 29th St entrance from pt Ave-26 x 40-Mill and pave 32nd St entrance from 1st Ave to the end of Go Mart-25 x120-Mill and pave 35th St entrance on both sides (NOT THE CENTER)-to 2nd Ave- each section 10 x 200-Mill and pave 36th St entrance from 1st Ave-24 x 28-Mill and pave 38th St to 39th St on 2nd Ave, one large section 25 x 35 38th St entrance from 2nd Ave, 12 x 24 mill & pave – tie into the section on 38 & 39th 39th St entrance from 1st Ave-26 x 80-Mill and pave 41st St entrance-from 1st Ave 10 x 32_Mill and pave 31st Street East, several sections marked them, starting with one through four Section one-number 90-12 x 40-Mill and pave Section two-15 x 170-Mill and pave Section three to house 100-13 x 250-Mill and pave Section four-12 x 230-Mill and pave Valentine circle finish curb back across their driveway ADDITIONAL INFO: To fill cracks with sealer is $1.00 per foot-from 40th St to 20th St This bid includes projected paving for the spring and fall of 2026 Bid will include labor, materials, and equipment, 2-inch asphalt unless otherwise noted, milling, and tie-ins Mill complete entire paving areas, not just the tie ends 2-inch full-depth milling on all areas Haul milled materials off-site Clear the area of loose debris and vegetation Apply tack to any areas with hills or sharp turns only Place and compact 2" of wearing 1" asphalt in prepared areas The streets have been dotted with paint to show the beginning & end of each section Each street will show total cost – we will do half this spring and half in the fall unless Council decides we can do all at one time.