Special DistrictNE
Posted
Nov 10, 2026
Dec 2, 2026
Ashbury Creek 3 Water - Section 1 RFP
Work includes approx 4,910 LF construct 8" DIP; 2,315 LF construct 12" DIP; 3 EA construct end of main hydrant, gate valve and tee assembly and backing block; 9 EA construct hydrant, gate valve and tee assembly; 1 EA construct 8"x8"x8" M.J Tee assembly and backing block; 2 EA construct 12"xl2"x8" M.J. Tee assembly and backing block; 1 EA construct 12"x12"x12" M.J. Tee assembly and backing block.
