Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes the removal of an existing single span steel beam open grate bridge including abutments, wingwalls and footers; and replacement with a single span reinforced concrete bridge (ridged frame structure) including wingwalls and footers. The existing bridge has an overall span of 29’-9”, the existing bridge roadway has a curb to curb width (between railings) of 24 feet. The proposed bridge has an overall span of 30 feet, the proposed bridge roadway has a curb to curb width (between railings) of 30’. Construction will occur in a Township right-of-way and will include all required demolition, grading, restoration work, installation of bituminous concrete pavement, lawn area restoration, along with provisions for all necessary erosion and sedimentation controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: -
Close: Feb 2, 2026
Replacement of Bridge
Overlook bridge replacement.
Posted Date
Jan 14, 2026
Due Date
Feb 24, 2026
Release: Jan 14, 2026
Close: Feb 24, 2026
Overlook bridge replacement.
AvailableReplacement of existing concrete deck bridge and steel substructure with a two-lane concrete box beam bridge system, installation of guiderails and end treatments, repaving of asphalt approaches, 10’ on each side from edge of concrete deck, workmanship and all appurtenances.
Posted Date
Jan 23, 2026
Due Date
Feb 20, 2026
Release: Jan 23, 2026
Close: Feb 20, 2026
Replacement of existing concrete deck bridge and steel substructure with a two-lane concrete box beam bridge system, installation of guiderails and end treatments, repaving of asphalt approaches, 10’ on each side from edge of concrete deck, workmanship and all appurtenances.
AvailableConstruction of: multi-bridge replacement project.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Construction of: multi-bridge replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis