Summary
Prep, paint, and replace flooring in buildings AS4015, AS4206, AS4207, and AS4208 at MCAS new river. Work consists of repairing damaged surfaces, treating mold, priming, and applying specified coatings to interior and exterior walls, doors, trim, masonry, metal, bathrooms, and high-bay areas. Protect and move furniture, replace damaged trim and caulking, repaint piping and signage, and ensure proper surface preparation where lead paint is present. Flooring work includes removing existing systems, installing new LVT in sleeping rooms, epoxy flooring in common areas and stairwells, replacing transitions and cove base, and ensuring surfaces are clean and sealed per.