Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of artificial turf along the right of way in two separate areas. Implement traffic controls during installation. Installer shall refer to the synthetic turf council technical guidelines for comprehensive performance and maintenance guidelines. The selected artificial turf for installation is a; envyplay code# cooo414. Installation process: utilize the installation manual for detailed steps on preparing the base, spreading the turf, and adding the infill material. Product selection: choose the appropriate synthetic turf based on the intended use, face weight and performance rating. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes stadium synthetic turf field replacement.
Posted Date
Dec 24, 2025
Due Date
Jan 27, 2026
Release: Dec 24, 2025
Close: Jan 27, 2026
Work includes stadium synthetic turf field replacement.
AvailableSeeks qualified bidders for grid/turf/block style paver installation at beach access(es). Contractor will provide and install: filter fabric; 8" of 57 stone base material; grid open-cell paver blocks (tremron, turf block (or similar) 3 1/8" in height. Finished installation shall be edged with plastic paver edging. Final four inches, including fill for open cells will be 7-8-9 stone; proposal for 12th south should assume a footprint of 1800 SF.
Posted Date
Dec 15, 2025
Due Date
Jan 16, 2026
Release: Dec 15, 2025
Close: Jan 16, 2026
Seeks qualified bidders for grid/turf/block style paver installation at beach access(es). Contractor will provide and install: filter fabric; 8" of 57 stone base material; grid open-cell paver blocks (tremron, turf block (or similar) 3 1/8" in height. Finished installation shall be edged with plastic paver edging. Final four inches, including fill for open cells will be 7-8-9 stone; proposal for 12th south should assume a footprint of 1800 SF.
Access point purchase and installation.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Access point purchase and installation.
AvailablePurchase and Installation of Technology Devices.
Posted Date
Dec 5, 2025
Due Date
Jan 21, 2026
Release: Dec 5, 2025
Close: Jan 21, 2026
Purchase and Installation of Technology Devices.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis