Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Access point purchase and installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Red Clay Consolidated School District (RCCD) seeks proposals to purchase and install up to 720 wireless access points across multiple schools, contingent on receiving E-Rate Category II funding for internal connections in the 2026 filing year. Vendors may propose hardware and/or installation services; the contract runs through June 30, 2027 with possible extensions. Key evaluation criteria include cost, K-12/government experience, authorized reseller status, warranty procedures, and vendors must provide SPIN and FCC Registration numbers.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Red Clay Consolidated School District (RCCD) seeks proposals to purchase and install up to 720 wireless access points across multiple schools, contingent on receiving E-Rate Category II funding for internal connections in the 2026 filing year. Vendors may propose hardware and/or installation services; the contract runs through June 30, 2027 with possible extensions. Key evaluation criteria include cost, K-12/government experience, authorized reseller status, warranty procedures, and vendors must provide SPIN and FCC Registration numbers.
AvailableSeeks qualified bidders for grid/turf/block style paver installation at beach access(es). Contractor will provide and install: filter fabric; 8" of 57 stone base material; grid open-cell paver blocks (tremron, turf block (or similar) 3 1/8" in height. Finished installation shall be edged with plastic paver edging. Final four inches, including fill for open cells will be 7-8-9 stone; proposal for 12th south should assume a footprint of 1800 SF.
Posted Date
Dec 15, 2025
Due Date
Jan 16, 2026
Release: Dec 15, 2025
Close: Jan 16, 2026
Seeks qualified bidders for grid/turf/block style paver installation at beach access(es). Contractor will provide and install: filter fabric; 8" of 57 stone base material; grid open-cell paver blocks (tremron, turf block (or similar) 3 1/8" in height. Finished installation shall be edged with plastic paver edging. Final four inches, including fill for open cells will be 7-8-9 stone; proposal for 12th south should assume a footprint of 1800 SF.
AvailablePurchase and Installation of Technology Devices.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Purchase and Installation of Technology Devices.
AvailablePurchase of access points and network switches.
Posted Date
Nov 24, 2025
Due Date
Jan 13, 2026
Release: Nov 24, 2025
Close: Jan 13, 2026
Purchase of access points and network switches.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →