Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Princeton University's Procurement Services issued an RFP to procure and install two 2,000L argon tanks in Briger Hall. Proposals are due by 4:00 PM EST on Monday, November 24, 2025 and bidders should consult the buyer's procurement portal for full solicitation documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of fuel tanks.
Posted Date
Nov 20, 2025
Due Date
Jan 5, 2026
Release: Nov 20, 2025
Close: Jan 5, 2026
Procurement of fuel tanks.
AvailablePremium
Access the largest public sector contact database
Replacement of two steel storage tanks at a functioning wwtp, coordinate with demolition company to remove old tanks, installation of walkways, one stairwell and connection to existing air lines, minor welding will be required on site.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
Replacement of two steel storage tanks at a functioning wwtp, coordinate with demolition company to remove old tanks, installation of walkways, one stairwell and connection to existing air lines, minor welding will be required on site.
AvailableFurnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Furnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
AvailableFurnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Furnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.