Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
North Carolina Department of Natural and Cultural Resources
Work includes window replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
North Carolina Department of Natural and Cultural Resources
Work includes replacement of existing water-cooled chiller with a new water cooled rotary screw chiller and associated, piping, electrical connections and temperature controls.
Posted Date
Oct 31, 2025
Due Date
Nov 25, 2025
Release: Oct 31, 2025
North Carolina Department of Natural and Cultural Resources
Close: Nov 25, 2025
Work includes replacement of existing water-cooled chiller with a new water cooled rotary screw chiller and associated, piping, electrical connections and temperature controls.
AvailableWashington State Department of Enterprise Services
Work includes building window replacement.
Posted Date
Oct 20, 2025
Due Date
Dec 2, 2025
Release: Oct 20, 2025
Washington State Department of Enterprise Services
Close: Dec 2, 2025
Work includes building window replacement.
AvailableDighton Housing Authority
The Project consists of the removal of exterior vinyl siding system and exterior windows and installation of new composite siding system and vinyl window assemblies. Asbestos Abatement activities are required for this project.
Posted Date
Oct 22, 2025
Due Date
Nov 19, 2025
Release: Oct 22, 2025
Dighton Housing Authority
Close: Nov 19, 2025
The Project consists of the removal of exterior vinyl siding system and exterior windows and installation of new composite siding system and vinyl window assemblies. Asbestos Abatement activities are required for this project.
State of Nevada Public Works Board
Removal of all existing carpet and base throughout specified areas of the building and replacing with new Luxury Vinyl Plank (LVP) flooring and new base in place of existing carpet and base.
Posted Date
Nov 6, 2025
Due Date
Dec 8, 2025
Release: Nov 6, 2025
State of Nevada Public Works Board
Close: Dec 8, 2025
Removal of all existing carpet and base throughout specified areas of the building and replacing with new Luxury Vinyl Plank (LVP) flooring and new base in place of existing carpet and base.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis