Summary
This construction will include trenching, backhoeing, bores, and the installation of all associated conduit, primary cable, secondary cable, new junction cabinets, transformers, and pedestals. All cables will be pulled in conduit (not direct buried). Terminations of cables at equipment and the installation of service cable (from pedestals to house meters) will be performed by the City. The addition consists of 3" conduit (SCH 40 except HDPE for bores) for all 1Ø primary and secondary and 4" conduit (SCH 40) for 3Ø primary. The houses in the addition are to be served by 2 loops. The entire addition will be served front-of-lot, with equipment placed within front-lot Utility Easement.