Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Vehicle body Damage Repair for Vehicle #3572, a 2023 Ford F-150 Full Size Super Cab Pick Up w/6.5’ Box, 6-Cyl, 2.7 Liter Engine VIN: #1FTEW1EP2PKF10543.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Crestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Crestmoor Canyon Storm Repair includes removing existing manhole, installing drilling piers, concrete base slab, tie concrete base slab to existing soldier pipes, new precast concrete manhole.
AvailablePremium
Access the largest public sector contact database
This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
AvailableVehicle services & repair.
Posted Date
Sep 26, 2023
Due Date
Jun 30, 2027
Release: Sep 26, 2023
Close: Jun 30, 2027
Vehicle services & repair.
Available130 Ea tube nf 008443 drain spout nf pts bk section 10 (t-k-66-1273) or equal.
Posted Date
Dec 11, 2025
Due Date
Dec 16, 2025
Release: Dec 11, 2025
Close: Dec 16, 2025
130 Ea tube nf 008443 drain spout nf pts bk section 10 (t-k-66-1273) or equal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis