Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The solicitation seeks a contractor to replace an undersized culvert on E.F. Tower Creek Road with an open-bottom custom arch structure to improve aquatic organism passage. The work includes temporary road access, approximately 5,000 cubic yards of excavation, installation of a 20-foot span by 16-foot rise arch pipe with engineered precast footings, gabion wingwalls, and backfill on a county gravel road. The project is located near Salmon in Lemhi County, Idaho and follows an in-stream work window typical for fish-passage projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace a buried approx. 120 LF 4' CMP with an open bottom custom arch pipe structure. Work includes temp access road during construction, excavation of approx 5,000 CY of earthwork, procurement and installation of a 20' span x 16' rise arch pipe, provision of engineered precast footings, installation of 170 sf of gabion wire wingwalls, and backfill on the County gravel road.
Posted Date
Nov 10, 2025
Due Date
Jan 22, 2026
Release: Nov 10, 2025
Close: Jan 22, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace a buried approx. 120 LF 4' CMP with an open bottom custom arch pipe structure. Work includes temp access road during construction, excavation of approx 5,000 CY of earthwork, procurement and installation of a 20' span x 16' rise arch pipe, provision of engineered precast footings, installation of 170 sf of gabion wire wingwalls, and backfill on the County gravel road.
The purpose of this project is to restore fish passage to Butler Creek, and independent tributary to the Strait of Juan de Fuca. At Pillar Point County Park, culvert #993889 (WDFW FPDSI #'s are used in this RFP) is a fish passage barrier and is tidally influenced. Integration of habitat restoration elements that are beneficial to/required by the civil project will be expected.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
The purpose of this project is to restore fish passage to Butler Creek, and independent tributary to the Strait of Juan de Fuca. At Pillar Point County Park, culvert #993889 (WDFW FPDSI #'s are used in this RFP) is a fish passage barrier and is tidally influenced. Integration of habitat restoration elements that are beneficial to/required by the civil project will be expected.
AvailableProvide asbestos clean-up /demolition for the tower road facility including the mobile home, main structure and old barn.
Posted Date
Dec 6, 2025
Due Date
Jan 15, 2026
Release: Dec 6, 2025
Close: Jan 15, 2026
Provide asbestos clean-up /demolition for the tower road facility including the mobile home, main structure and old barn.
AvailableThe Minnesota Department of Natural Resources issued an RFB for Tower Area Road Grading seeking contractors to perform road grading and related site work for DNR-managed property near Tower, MN. The opportunity was posted on 2025-12-23 and, per the listing, closes in early January 2026; vendors are expected to submit responses through the state's procurement/bid portal indicated in the posting. This is a competitive construction bid (not a grant) for road grading services; bidders should obtain the full specifications and submission instructions from the official Bonfire posting at the URL above.
Posted Date
Dec 23, 2025
Due Date
Jan 9, 2026
Release: Dec 23, 2025
Close: Jan 9, 2026
The Minnesota Department of Natural Resources issued an RFB for Tower Area Road Grading seeking contractors to perform road grading and related site work for DNR-managed property near Tower, MN. The opportunity was posted on 2025-12-23 and, per the listing, closes in early January 2026; vendors are expected to submit responses through the state's procurement/bid portal indicated in the posting. This is a competitive construction bid (not a grant) for road grading services; bidders should obtain the full specifications and submission instructions from the official Bonfire posting at the URL above.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →