Town of Elkin
Apron expansion includes, sediment basins for primary erosion control, approx. 58,000 CY of embankment in place, approx. 1,200 LF of storm pipe, approx. 2,300 CY of crushed aggregate base course, and approx. 2,300 TN of asphalt surface course (S9,5B). Partial parallel taxiway includes, sediment basins for primary erosion control, approx. 57,000 CY of embankment in place, approx. 1,500 LF of storm pipe, approx. 2,100 CY of crushed aggregate base course, approx. 2,100 TN of asphalt surface course (S9,5B), and edge lighting / signage for the new partial parallel taxiway system.
Great Lakes and Ohio River Division
Provide replacement of deteriorating taxiway and apron pavements.
U.S. Army Engineer District Huntington
Replacement of deteriorating taxiway and apron pavements.
City of Cortez
Project consists of the construction of new asphalt apron located on the southwest side of the existing asphalt apron. In addition to the new asphalt pavement, this project will include the demolition and installation of a new underdrain system, removal of an existing drainage structure, extension of stormwater pipe, installation of aircraft tie downs, the removal and installation of new retroreflective markers, replacement of an existing electrical handhole, and pavement markings. See outside link.
Release
Oct 16, 2025
Close
Nov 19, 2025