Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Projects consist of 350 LF removal of existing sewer and construct 8" PVC SDR-35 pipe sewer; 105 LF furnish and install 8" dia SDR-35 PVC sewer; 1,500 LF furnish and install 10" dia SDR-35 PVC sewer; 122 LF furnish and install 8" dia PVC SDR-35 sewer within 18" inner diameter steel casing; 2,400 LF abandon and cap existing sewer main; 17 EA furnish and install 48" dia manhole; 23 EA reconnect sewer lateral services; 1 LS post-construction CCTV inspection of sewer main; 122 LF jack/bore 18" inner diameter steel casing; 1 LS replace traffic striping, pavement markings. See attached file
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of sewer line replacement.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Project consists of sewer line replacement.
AvailableConsists in general of repair or replacement of existing culverts associated with the annual resurfacing projects. The project will also include but not limited to site specific culvert replacement work may also include minor HMA/Concrete work and site restoration.
Posted Date
Dec 26, 2025
Due Date
Jan 29, 2026
Release: Dec 26, 2025
Close: Jan 29, 2026
Consists in general of repair or replacement of existing culverts associated with the annual resurfacing projects. The project will also include but not limited to site specific culvert replacement work may also include minor HMA/Concrete work and site restoration.
AvailableEmergency repair or replacement of underground sewer mains & manhole structures.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Emergency repair or replacement of underground sewer mains & manhole structures.
AvailableWork includes an exterior veneer repair and replacement project.
Posted Date
Dec 12, 2025
Due Date
Jan 12, 2026
Release: Dec 12, 2025
Close: Jan 12, 2026
Work includes an exterior veneer repair and replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis