Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide preventative maintenance to sump pump systems at several county locations. The purpose of this preventive maintenance service is to ensure the sump pump system operates efficiently, safely, and reliably to prevent water intrusion, flooding, and equipment failure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
The removal, replacement, and installation of complete sewage sump pump systems. Install complete sewage sump pump systems: City Hall Sub-Basement needs to replace the faulty sewage sump pump bearing, discharge piping inside the pit, a full-port gate, check valves, and upgrade the controls. EOC Sub-Basement requires the replacement of the discharge piping inside the pit, upgrading of the controls, a full-port gate, and check valves. Police Station requires the replacement of two (2) sump pump systems, a full-port gate, check valves, upgrading of controls, and a new 208/230 volt 20 amp circuit.
AvailableProvide construction inspection, preventative maintenance bridge repair contract.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
Provide construction inspection, preventative maintenance bridge repair contract.
AvailableThe City of Independence (Municipal Services Department) solicits bids for Annual Pavement Maintenance Roadway Seals covering preparation and application of pavement sealing at multiple locations across the city. Bids must be submitted online through PublicPurchase and the solicitation includes specifications under ITB #25075; questions are due by 5:00 PM local on January 23, 2026. The posted due date for proposals is January 27, 2026 and the estimated value range is $500,000–$2,000,000 (AI estimate).
Posted Date
Dec 30, 2025
Due Date
Jan 27, 2026
Release: Dec 30, 2025
Close: Jan 27, 2026
The City of Independence (Municipal Services Department) solicits bids for Annual Pavement Maintenance Roadway Seals covering preparation and application of pavement sealing at multiple locations across the city. Bids must be submitted online through PublicPurchase and the solicitation includes specifications under ITB #25075; questions are due by 5:00 PM local on January 23, 2026. The posted due date for proposals is January 27, 2026 and the estimated value range is $500,000–$2,000,000 (AI estimate).
AvailableBridge preventative maintenance.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Bridge preventative maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis