Summary
Installing up to 10,400' of pipe, ranging in diameter from 42 to 30", to replace about 2 miles of the existing earthen canal. The project includes replacing the existing turnout structures and installing stainless steel control structures with gates at turnout locations for water management. Work includes, but is not limited to, installing cast-in-place transition structures, slip-lining through existing culverts under roadways, demolishing and removing existing culverts under roadways, installing fittings and appurtenances, excavation and backfill, erosion and sediment control, and related activities.