Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The roadway is to be widened by approx five feet, including installation of some curb and gutter, milling, and a 2-inch HMAC overlay. Project length is approx 876 LF.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Louisville (Public Works) is soliciting professional engineering services to perform planning and final design for the Herr Lane Widening project as described in the Herr Lane Corridor Transportation Plan Final Report (Aug 2017). The contract period of performance is approximately 12 months from award and will involve preparing final design plans, stakeholder coordination, and compliance with local/state/federal regulations. The Bonfire posting lists required submission documents (e.g., Statement of Qualification, W-9, Acknowledgements and Preferences) and provides contact and question deadlines.
Posted Date
Dec 29, 2025
Due Date
Jan 19, 2026
Release: Dec 29, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Louisville (Public Works) is soliciting professional engineering services to perform planning and final design for the Herr Lane Widening project as described in the Herr Lane Corridor Transportation Plan Final Report (Aug 2017). The contract period of performance is approximately 12 months from award and will involve preparing final design plans, stakeholder coordination, and compliance with local/state/federal regulations. The Bonfire posting lists required submission documents (e.g., Statement of Qualification, W-9, Acknowledgements and Preferences) and provides contact and question deadlines.
AvailableCity of Louisville is soliciting professional engineering services for planning and final design of the Herr Lane Widening Final Design Phase (Project #7 in the Herr Lane Corridor Transportation Plan). The solicitation (RFP260134) requests submission of specified documents (Statement of Qualification, W-9, Vendor Information, Acknowledgements, etc.) and supporting files are available on the buyer portal but require a Bonfire account to download. The opportunity opened 2025-12-29T20:00:00Z and closes 2026-01-19T20:00:00Z; it is not a grant and was open as of 2025-12-31.
Posted Date
Dec 29, 2025
Due Date
Jan 19, 2026
Release: Dec 29, 2025
Close: Jan 19, 2026
City of Louisville is soliciting professional engineering services for planning and final design of the Herr Lane Widening Final Design Phase (Project #7 in the Herr Lane Corridor Transportation Plan). The solicitation (RFP260134) requests submission of specified documents (Statement of Qualification, W-9, Vendor Information, Acknowledgements, etc.) and supporting files are available on the buyer portal but require a Bonfire account to download. The opportunity opened 2025-12-29T20:00:00Z and closes 2026-01-19T20:00:00Z; it is not a grant and was open as of 2025-12-31.
AvailableAsymmetrical widening of the bridge over E-470 including expansion of the MSE wall on one side of the structure, signal upgrades at the ramp intersections, widening of roadway sections for tie-ins at the new bridge, multimodal improvements across the bridge, trail connectors and sidewalk improvements, along with drainage and water quality improvements for the bridge expansion.
Posted Date
Nov 26, 2025
Due Date
Jan 21, 2026
Release: Nov 26, 2025
Close: Jan 21, 2026
Asymmetrical widening of the bridge over E-470 including expansion of the MSE wall on one side of the structure, signal upgrades at the ramp intersections, widening of roadway sections for tie-ins at the new bridge, multimodal improvements across the bridge, trail connectors and sidewalk improvements, along with drainage and water quality improvements for the bridge expansion.
AvailableRelease: Dec 26, 2025
Close: Jan 20, 2026
Work includes widening & bridge replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →