City of Alta
The equipment to be supplied is described in general as follows: Primary Cable Fittings, Primary and Secondary Pedestals, Secondary Connectors, Fault Indicators, Cable Sealing and Identification Material, Grounding Materials, Overhead Materials.
Princeton Public Utilities Commission
The material required is as follows: • 15 kV Padmount Switchgear (Dead-Front, Air-Insulated, Fused) • 15 kV Primary Power Cable • Single Phase Padmount Distribution Transformers • Three Phase Padmount Distribution Transformers • 600A Deadbreak Elbows
Milford Municipal Utilities
The equipment to be supplied is described in general as follows:\r Primary Cable Fittings, Grounding Materials, Primary Pull Boxes, Primary Pedestals
Township of Grand Tower
Project consists of water distribution system improvements.