Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 44.907 MF primary cable; 0.040 MF 48" trenching; 0.090 MF 5" conduit in trench; 5.530 MF 2" bore with conduit; 7 EA 6" diameter core dril.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Alta Municipal Utilities is soliciting bids for Phase 1 electric distribution improvements. The work includes installation of underground primary and secondary cables within existing rights-of-way/easements, padmount transformer box pads, sectionalizing cabinets, and secondary pedestals per staking sheets and specifications. Bids are due February 11, 2026, and documents are being distributed via the engineer’s QuestCDN plan room.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Alta Municipal Utilities is soliciting bids for Phase 1 electric distribution improvements. The work includes installation of underground primary and secondary cables within existing rights-of-way/easements, padmount transformer box pads, sectionalizing cabinets, and secondary pedestals per staking sheets and specifications. Bids are due February 11, 2026, and documents are being distributed via the engineer’s QuestCDN plan room.
Alta Municipal Utilities (Iowa) is rebidding the furnishing of minor materials for its Phase 1 Electric Distribution Improvements project. Materials include items such as primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, and overhead materials. The rebid was posted January 14, 2026, with bids due February 11, 2026, and documents distributed through QuestCDN.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Alta Municipal Utilities (Iowa) is rebidding the furnishing of minor materials for its Phase 1 Electric Distribution Improvements project. Materials include items such as primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, and overhead materials. The rebid was posted January 14, 2026, with bids due February 11, 2026, and documents distributed through QuestCDN.
AvailableThe equipment to be supplied is described in general as follows: primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, overhead materials.
Posted Date
Oct 15, 2025
Due Date
Feb 11, 2026
Release: Oct 15, 2025
Close: Feb 11, 2026
The equipment to be supplied is described in general as follows: primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, overhead materials.
AvailableConstruction of 12.47 KV primary electric underground circuits. The project includes the installation of owner-furnished padmount switchgear, boxpads, and 15 KV primary cable in contractor-furnished and installed conduit in trench, bore, or other excavations.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
Construction of 12.47 KV primary electric underground circuits. The project includes the installation of owner-furnished padmount switchgear, boxpads, and 15 KV primary cable in contractor-furnished and installed conduit in trench, bore, or other excavations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →