Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of Well Construction of 2 12" permanent production wells complete with stainless steel well screen, steel drive pipe, and casing; gravel pack; grout; vertical turbine pump; pump base, well development and performance testing; water quality testing; and associated Work; 16 FT x 12 FT steel-sided well control buildings; concrete foundation; installation of process pipe, magnetic flow meter, well prelubrication system, approx 125 Ft of 10" pipe, 625 FT of 14" pipe, and 650 FT of 16" raw water transmission pipeline; site grading; seeding; and associated Work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
Posted Date
Sep 22, 2025
Due Date
Jan 8, 2026
Release: Sep 22, 2025
Close: Jan 8, 2026
Work consists of well 21 construction and testing project. The work includes drilling an adjacent shallower well at an existing production well site, as well as performing an 8-hour step pump test and an 8-hour aquifer test.
AvailableProvide airport planning services for merrill field airport master plan & ALP update.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Provide airport planning services for merrill field airport master plan & ALP update.
AvailablePower Supply.
Posted Date
Nov 18, 2021
Due Date
Nov 15, 2026
Release: Nov 18, 2021
Close: Nov 15, 2026
Power Supply.
AvailableDane County is seeking Statement of Qualifications (SOQ) from qualified firms to provide services for the Master Plan & Airport Layout Plan (ALP) Update at the Dane County Regional Airport (MSN). This project is in accordance with FAA Advisory Circular 150/5100-14E and Dane County policies and procedures. Proposals are due by Friday, January 16, 2026, at 2:00 pm Central Time.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Dane County is seeking Statement of Qualifications (SOQ) from qualified firms to provide services for the Master Plan & Airport Layout Plan (ALP) Update at the Dane County Regional Airport (MSN). This project is in accordance with FAA Advisory Circular 150/5100-14E and Dane County policies and procedures. Proposals are due by Friday, January 16, 2026, at 2:00 pm Central Time.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis