CityOR
Posted
Oct 21, 2026
Dec 2, 2026
Outback Facility Improvements Project Design Engineering Services
The City of Bend (the “City”) requests proposals from qualified engineering firms to serve as the design engineer (the “Designer”) and Engineer of Record (“EOR”) for the Outback Facility Improvements Project (No. 1WOFI). The Project strengthens water system resiliency, protects finished water quality, and improves power reliability at the Outback Water Filtration Facility (“WFF”), delivering the near-term improvements identified in the 2026 Outback Facility Plan, using the Construction Manager/General Contractor (“CM/GC”) alternative delivery method. The Designer must coordinate with the City, the owner's representative, the Independent Cost Estimator (“ICE”), and the CM/GC, and provide engineering services during construction. Detailed information regarding the services to be provided can be found in Exhibit A – Scope of Work.
