Summary
Work inlcudes 18,400 SF grind existing ac to a depth of 2"; 442,900 SF grind existing ac to a depth of 2.5"; 2,750 CY sawcut and remove roadway section to a depth of 6"; 7,530 TN provide & construct 2" arhm type (arhm-gg-c 1/2" pg 64-16ar); 1,810 TN provide & construct 0.5" ac type iii (d2-pg 64-10); 5,950 TN provide & construct 3.5" ac type iii (b3-pg 64-10); 442,900 SF fiberglass geogrid; 15 EA remove existing pcc curb ramp; 2,235 SF remove existing pcc cross gutter & spandrel; 180 LF remove existing guard rail; 2,235 SF construct pcc cross gutter & spandrel; 20 EA lower and adjust sewer manhole to grade. See outside link.