Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of approx 8,400 LF of 8" DIP Walter line; 1,600 LF of 8" Restrained Joint DIP Water Line; 190 LF of 16" DIA by 0.25" Thick Steel encasement by Bore and Jack with 8" Ductile Iron RJ carrier Pipe; 2,200 EA of Compact Ductile Iron Fittings; 270 LF of pavement repair; 320 LF of Asphalt Drive. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Project includes phase 2 raw water line extension consists of approx 1,900 LF of 20" raw water line including a jack and bore crossing of a road and railroad with approx 137 LF of raw water line installed in steel casing. Project includes modifications to interconnections at a pump station and water treatment plant site on each end of the raw water line.
Premium
Access the largest public sector contact database
Work includes covered bridge road water main extension project.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes covered bridge road water main extension project.
AvailableBarrow County Board of Commissioners solicits sealed bids for the Covered Bridge Road Water Main Extension (RFB2026-10). Bids are due at 2:00 PM Eastern on December 18, 2025 and must be submitted to the Barrow County Clerk’s Office in Winder, GA; construction documents are available via the county website.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Barrow County Board of Commissioners solicits sealed bids for the Covered Bridge Road Water Main Extension (RFB2026-10). Bids are due at 2:00 PM Eastern on December 18, 2025 and must be submitted to the Barrow County Clerk’s Office in Winder, GA; construction documents are available via the county website.
AvailableFauquier County, Virginia issued an Invitation to Bid for the Phase 2 Raw Water Line Extension to construct approximately 1,900 linear feet of 20-inch raw water line including a 137-foot jack-and-bore casing across road and railroad crossings and interconnection modifications at a pump station and water treatment plant. The project requires municipal water infrastructure construction expertise (large-diameter piping, HDD/jack-and-bore, utility interconnections) and detailed contract documents outline the technical specifications and submittal requirements. The solicitation was posted on December 8, 2025 and bids are due December 18, 2025, indicating an active and near-term procurement.
Posted Date
Dec 8, 2025
Due Date
Dec 18, 2025
Release: Dec 8, 2025
Close: Dec 18, 2025
Fauquier County, Virginia issued an Invitation to Bid for the Phase 2 Raw Water Line Extension to construct approximately 1,900 linear feet of 20-inch raw water line including a 137-foot jack-and-bore casing across road and railroad crossings and interconnection modifications at a pump station and water treatment plant. The project requires municipal water infrastructure construction expertise (large-diameter piping, HDD/jack-and-bore, utility interconnections) and detailed contract documents outline the technical specifications and submittal requirements. The solicitation was posted on December 8, 2025 and bids are due December 18, 2025, indicating an active and near-term procurement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis