CountyCA
Posted
Aug 11, 2026
Sep 29, 2026
Unit 2 Phase 5-2 Liner Construction Project At the San Timoteo Sanitary Landfill
Work consists of layout and types of deck panels, anchorage details, reinforcing channels, pans, cut deck openings, special jointing, accessories, and attachments to other construction. Install temporary shoring before placing deck panels. Fasten roof-deck panels to steel supporting members by arc spot (puddle) welds of the surface diameter indicated or arc seam welds with an equal perimeter that is not less than 1-1/2" long
