Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation of approximately 480 linear feet of airport way, pavement reconstruction, adjusting utility castings to grade, traffic control, and other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Premium
Access the largest public sector contact database
Close: Jan 5, 2026
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
AvailablePerform a full reconstruction of Runway 10L-28R including lighting, striping, NVAIDS, and electrical includes 77,390 LF unclassified excavation, 90,840 SF new pavement markings with reflective beads, 1,080 LF install new 18" F679 PVC, 170 LF install new 24" steel casing, 10,190 LF D-705-5.2 6" Perforated PVC Underdrain Pipe, Complete, 9 EA install new manhole (type I), 6,550 LF L-110-5.4 1-2" Conduit, Schedule 40 PVC - Direct Buried, 11,180 LF L-110-5.5 1-2" Conduit, Schedule 40 PVC - CLSM. 660 LF L-110-5.25 1-2" Conduit, SDR 11 HDPE - Directionally bored Duct Bank, 1,200 LF S-142-5.5 3-#8, AWG, XHHW-2, 600V Wire (FAA).
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Perform a full reconstruction of Runway 10L-28R including lighting, striping, NVAIDS, and electrical includes 77,390 LF unclassified excavation, 90,840 SF new pavement markings with reflective beads, 1,080 LF install new 18" F679 PVC, 170 LF install new 24" steel casing, 10,190 LF D-705-5.2 6" Perforated PVC Underdrain Pipe, Complete, 9 EA install new manhole (type I), 6,550 LF L-110-5.4 1-2" Conduit, Schedule 40 PVC - Direct Buried, 11,180 LF L-110-5.5 1-2" Conduit, Schedule 40 PVC - CLSM. 660 LF L-110-5.25 1-2" Conduit, SDR 11 HDPE - Directionally bored Duct Bank, 1,200 LF S-142-5.5 3-#8, AWG, XHHW-2, 600V Wire (FAA).
AvailableStreet reconstruction project.
Posted Date
Dec 3, 2025
Due Date
Dec 18, 2025
Release: Dec 3, 2025
Close: Dec 18, 2025
Street reconstruction project.
AvailableReplacement of the sanitary sewer line and the associated street reconstruction of approx. 600 LF.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Replacement of the sanitary sewer line and the associated street reconstruction of approx. 600 LF.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis