CityAZ
Posted
Oct 30, 2026
Dec 10, 2026
PRC Airport Hangar Development Phase 1
The Prescott Regional Airport (PRC) is soliciting for construction of an Executive Hangar Development. The project will consist of a 4-unit, 16,315 square foot hangar development project. The hangar shall be a pre-engineered steel building. The pre-engineered steel building will be based upon architectural performance specifications and not a single-source steel manufacturer. The hangar shall have a water fire suppression system along with interior floor drains with 1,500 gallon oil and water separator. Civil site improvements consists of grading, drainage, utilities, aircraft taxi lane pavement and security fencing. Also included is a concrete aircraft wash rack with water and drainage improvements. There is a market shortage of hangar space specifically for executive-size aircraft with wingspans of up to 64 feet (e.g. Beechcraft King Air 350). The project will help fulfill that need while providing great access to our commercial runway 21L/3R. The project is located primarily along the Bottle Neck Wash on Ruger Road north of Airport Avenue.
