Project involves the construction of a 5.2-acre urban fishing pond with clay liner, multi-stage outlet structure, water quality forebay, vegetative filter strip, fish spawning bed, fishing jetties, ADA fishing pads, parking lot, collapsible bollards, reconstructed ADA accessible walkway, sidewalk, boat access, limestone block seating, bench pads, and site lighting/electrical service modifications. The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements, which include: construction entrance, construction fencing, traffic control, erosion control practices, construction survey, clearing and grubbing, removal of existing site infrastructure, grading operations, compaction testing, dewatering, structural fishing pads/retaining walls, utilities (multi-stage outlet structure, outlet pipe, culverts, subdrain tile, and water main), paving operations, pavement markings, traffic signage, limestone blocks, bench pads, collapsible bollards and footing, seeding operations, erosion control matting, grid-tied concrete block mat and associated concrete anchor trench, concrete steps and associated handrail, relocation of existing site lighting, construction of light fixture bases, installation of proposed site lighting, installation of electrical receptacle boxes, and extension/modification of existing site electrical services.
Available