Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing all labor, equipment, and materials for the construction of Water System Improvements 2024, Adventure land Drive Water Transmission Main project, which consists of: 1.Installation of approximately 335 linear feet of new 16-inch diameter water main. 2.Installation of approximately 290 linear feet of new 16-inch diameter restrained joint water main by trenchless construction. 3.Water main appurtenances including new valves, fittings, fire hydrants, connections to existing water mains, and removal of existing water main. 4.Pavement removal and replacement, including 23 square yards of new shared use path, and related appurtenances. 5.Temporary traffic control. 6.Erosion and sediment control, including hydraulic seeding, linear erosion control, and SWPPP management. 7.Trench foundation, unsuitable backfill replacement, trench compaction testing, topsoil respread and mobilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
AvailableThis project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis