Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
This project consists of 17,180 LF of 16" water transmission main; 50 LF of 4" water transmission main tie in; 160 LF of 6" water transmission main tie in; 600 LF of 8" water transmission main perpendicular. Additionally, there is a 1,150 LF 8" water transmission main, a new master meter vault and appurtenances. See attached file.
Premium
Access the largest public sector contact database
Release: Nov 18, 2025
Close: Dec 18, 2025
Water main improvements.
AvailableRelease: Nov 18, 2025
Close: Dec 18, 2025
Water main improvements.
AvailableConstruction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
Posted Date
Nov 28, 2025
Due Date
Jan 8, 2026
Release: Nov 28, 2025
Close: Jan 8, 2026
Construction of approx. 17,000 LF of 30" diameter potable water transmission main, to replace an existing transmission main, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; connections to existing distribution and transmission mains; abandonment of existing water distribution and transmission mains; the transmission main replacement includes two horizontal directional bore and an auger bore casing installation under Hwy 101; approx. 3,600 LF of 12" and 16" diameter potable water distribution line feeding the Port of Tillamook Bay, to replace an existing distribution line, including fittings, valves, vaults, combination air release valves and low point blow-off and drain assemblies; the service line includes pipe installation involving HDD and auger bore techniques; surface restoration, pavement restoration, traffic control and the performance of any other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis