Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hot Mix Asphalt minor structural repair and overlay.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
work includes approx. 6,776 TON of HMA, 2, 58S, surface, 9.5 mm (TON); 3,388 TON of HMA wedge and level, type B (TON); 52,800 LF of line, multi-component, solid, white, 4" (LF); 52,800 LF of line, multi-component, solid, yellow, 4" (LF); 1,955 TON of compacted aggregate, no.53 (TON); 781 SY of milling, transition (SY); 360 SY of milling, approach (SY); 407 TON of HMA patching, full depth, type B (TON); see outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 22, 2025
Release: Nov 21, 2025
Close: Dec 22, 2025
work includes approx. 6,776 TON of HMA, 2, 58S, surface, 9.5 mm (TON); 3,388 TON of HMA wedge and level, type B (TON); 52,800 LF of line, multi-component, solid, white, 4" (LF); 52,800 LF of line, multi-component, solid, yellow, 4" (LF); 1,955 TON of compacted aggregate, no.53 (TON); 781 SY of milling, transition (SY); 360 SY of milling, approach (SY); 407 TON of HMA patching, full depth, type B (TON); see outside links for more details.
Premium
Access the largest public sector contact database
8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
8.78 mil gross of HMA designed overlay and installation of four foot HMA safety shoulders along with edge line rumble strips. See outside link.
AvailableProject consists of the following: This project consists of 1.75” Hot Mix Asphalt (HMA) overlay on approximately 9.65 miles of road in Harvey County, Kansas. Road widths are generally 24 feet wide. HMA shall be KDOT Commercial Grade Mix (Class A). HMA application shall be with a spray paver for W. Dutch Ave. on both locations (9.65 miles). Approximately 3,498 SY of milling will be required as part of the scope of work, including but not limited to milling transitions at the beginning of the project, end of the project, intersections, and at bridge approaches. Temporary pavement marking is included in this contract, subsidiary to HMA costs, and shall be on the centerline only.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
Project consists of the following: This project consists of 1.75” Hot Mix Asphalt (HMA) overlay on approximately 9.65 miles of road in Harvey County, Kansas. Road widths are generally 24 feet wide. HMA shall be KDOT Commercial Grade Mix (Class A). HMA application shall be with a spray paver for W. Dutch Ave. on both locations (9.65 miles). Approximately 3,498 SY of milling will be required as part of the scope of work, including but not limited to milling transitions at the beginning of the project, end of the project, intersections, and at bridge approaches. Temporary pavement marking is included in this contract, subsidiary to HMA costs, and shall be on the centerline only.
AvailableProject consists of 3/4" HMA leveling course and 2" of HMA surfacing.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Project consists of 3/4" HMA leveling course and 2" of HMA surfacing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis