Work consists of park pathway asphalt concrete and concrete construction, repair, and rehabilitation along with outdoors sport court rehabilitation, resurfacing, and restriping at various parks throughout the city. Work includes traffic control; asphalt concrete grinding; placement of hot-mix asphalt concrete; asphalt concrete patch paving; crack sealing; placement of seal coat; minor concrete construction; remove and replace existing damaged concrete sidewalks; wheelchair accessible curb ramp upgrades; resurfacing basketball courts; restriping basketball court; removal and replacement of basketball poles, hoops and accessories; root pruning; installation of header boards; minor grading and backfilling; installation of park benches, picnic tables, trash receptacles, and other related items of work as needed to complete the public works improvements.