Painting & Blasting Services -- McDuffie Coal Terminal RFP
On-retainer industrial painting and blasting services at McDuffie Coal Terminal.
Description: The Alabama Port Authority (APA) is procuring twelve (12) ABB ACS 880-07-0635A-5 drives with specified options and plus-codes for inventory and conveyor installations at the McDuffie Coal Terminal in Mobile, AL. All drives and parts must be Buy America, Build America (BABA) compliant, delivered FOB destination to the McDuffie Coal Terminal Warehouse, and comply with the features and parameters listed in Exhibit A. The procurement is a firm-fixed-price, best-value (lowest-priced technically acceptable) RFP requiring full proposal submissions including pricing, warranties, delivery lead times, and specified attachments.
StateAgency · AL, US
Adjacent opportunities open for bidding right now.
State AgencyAL
Posted
Oct 23, 2026
Nov 23, 2026
On-retainer industrial painting and blasting services at McDuffie Coal Terminal.
State AgencyAL
Posted
Nov 13, 2026
Dec 1, 2026
Procurement of ABB/Baldor electric motors (two specified models, F1 and F2) for the McDuffie Coal Terminal in Mobile, AL, totaling 10 units (5 F1 and 5 F2). This is a firm-fixed-price, one-time equipment purchase that requires manufacturing, testing, packaging and FOB destination delivery to the McDuffie Coal Terminal Warehouse with staged delivery deadlines (four motors by 2027-03-16 and six motors by 2027-04-20). Proposals must offer the specified ABB branded line items only, include warranty and delivery lead-time information, and award will be made on a best-value, lowest-priced technically acceptable basis with liquidated damages for delays.
State AgencyAL
Posted
Oct 23, 2026
Nov 23, 2026
Painting & Blasting services are to prepare assets for painting and painting protective coating on metallic material, as requested by McDuffie Coal Terminal personnel. Painting work will be on project assets that may be undertaken contain, but are not limited to, Ship Loaders, Cranes, Barge Unloaders, Conveyor Transfer Towers, Stacker-Reclaimers, and other related equipment. Blasting work has Surface Preparation as an expectation in the protective coating scope of work. The Alabama Port Authority holds awarded contractors to Surface Preparation standards. Prior to coating, all substrates shall be cleaned in strict accordance with SSPC-SP1 (Solvent Clean) using minimum 5000 psi, power washer with heated water to a minimum of 210° F (Water Cleaning LP WC).
Los Angeles Department of Water and Power
Special DistrictCA
Posted
Nov 5, 2026
Dec 1, 2026
Bol dummy transformer ratingen mv 3442 part #gsa250 e 90 or equivalent: core 1: 1200a/5a mr, c400, 60hz, rf 1.5 core 2: 600/1200/5a dr, 0.3 b 0.5, 60hz, rf 1. 5, 3 each.
From the first pre-RFP signals to the published RFP and its files.
Annual financial report
409 days before RFP
The FY2025 report recorded a multi-year $15 million McDuffie modernization initiative involving data-driven monitoring, preventive-maintenance planning, and control-flow and conveyor upgrades.
In fiscal 2024 the Authority engaged QCA Systems, a Canadian Bulk Handling Systems company to launch a multi-year, $15 million modernization initiative. This initiative will replace outdated manual operating processes with more systemic, data-driven work plans and monitoring capabilities. The primary goal of these investments is to leverage technology and…
Alabama Port Authority Annual Comprehensive Financial Report FY2025
Annual financial report · Sep 30, 2025
RFP published
Proposals due (8 days left)