CityAL
Posted
Oct 17, 2026
Nov 12, 2026
Central Park- Way & Beltline Place Improvements RFP
Work inlcudes constructing new roadway, earthwork grading, storm drainage, base, paving, sanitary sewer main installation, striping and markings.
Description: Work includes 30 CY of pavement removal, 200 SY aggregate pavement base (6"), 325 SY concrete sidewalk (6"), 2 curb ramps, 140 LF curb and gutter, prefabricated concrete restroom building (1), electrical service, water service, sanitary sewer service, splash pad, playground, rubber playground surfacing, street signage, pavement markings, erosion control, seeding, and appurtenances.
City · KS, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityAL
Posted
Oct 17, 2026
Nov 12, 2026
Work inlcudes constructing new roadway, earthwork grading, storm drainage, base, paving, sanitary sewer main installation, striping and markings.
CityKS
Posted
-
Nov 12, 2026
Provide distribution system improvements. The project includes the following work: construct approx.: 350' of 12" C-900/ 14" HDPE waterline; 21,000' of 10" c-900/ 12" HDPE waterline; 37,700' of 8 C-900/HDPE waterline; 48,500' of 6" C-900/ HDPE waterline; 1,500' of 4" C-900/ HDPE waterline; 4,700' of 2" PVC/ HDPE waterline.
CityMS
Posted
Oct 14, 2026
Nov 13, 2026
Work inlcudes installation of approx 222 LF of 18 reinforced concrete pipe, installing 4 grate inlets, removing approx 60 LF of existing 6 and 10 corrugated plastic drain pipe, removing 2 existing grate inlets, grading areas along the run of storm drain pipe to drain, installing solid sod on disturbed areas, and all other necessary appurtenances.
State AgencyKS
Posted
-
Oct 29, 2026
Work includes desludging the two cell wastewater treatment lagoon facility. Installation of new control structures, new piping and new discharge structures. Installation of new woven wire WWTF perimeter fencing. Lagoon side slope re-shaping and rip rap slope protection rock installation. Also includes 1 LS of clearing and grubbing; 1 LS of sludge removal (cell 1 and cell 2); 1,145 LF of woven wire lagoon fencing; 377 LF of SDR 21 PVC 8" sanitary sewer.