Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project is for the replacement of the road bridge and other miscellaneous construction, as indicated on the approved drawings included in the bid package.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project includes the following Work at each site: Remove temporary bridge, demolish old bridge abutments, construct new cast-in-place concrete footers/abutments/wingwalls, installation of new rolled girder bridge with concrete decking (65’ span Randell Road, 60’ span Airport Road), rock armoring, roadway construction and associated work.
Posted Date
Nov 21, 2025
Due Date
Dec 22, 2025
Release: Nov 21, 2025
Close: Dec 22, 2025
The Project includes the following Work at each site: Remove temporary bridge, demolish old bridge abutments, construct new cast-in-place concrete footers/abutments/wingwalls, installation of new rolled girder bridge with concrete decking (65’ span Randell Road, 60’ span Airport Road), rock armoring, roadway construction and associated work.
Premium
Access the largest public sector contact database
Mobilization; grading; 2 cy, select granular material, class iii; 1 ton, asphalt conc base course, type b25. 0c; 1 ton, asphalt conc intermediate course, type i19. 0c; 90 lf, remove & reset existing guardrail; 96 sf, work zone signs (stationary); 224 sf, work zone signs (portable). See attached file for full scope.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
Mobilization; grading; 2 cy, select granular material, class iii; 1 ton, asphalt conc base course, type b25. 0c; 1 ton, asphalt conc intermediate course, type i19. 0c; 90 lf, remove & reset existing guardrail; 96 sf, work zone signs (stationary); 224 sf, work zone signs (portable). See attached file for full scope.
AvailableRelease: Dec 2, 2025
Close: Jan 12, 2026
Repair of county bridge.
AvailableLorain County Board of Commissioners seeks proposals for a Design-Build project to replace the Hawley Rd Bridge #0823 in Wellington Township. The project requires compliance with Ohio Department of Transportation specifications and prevailing wage rates. Bidders must be ODOT pre-qualified for highway construction.
Posted Date
Nov 7, 2025
Due Date
Dec 18, 2025
Release: Nov 7, 2025
Close: Dec 18, 2025
Lorain County Board of Commissioners seeks proposals for a Design-Build project to replace the Hawley Rd Bridge #0823 in Wellington Township. The project requires compliance with Ohio Department of Transportation specifications and prevailing wage rates. Bidders must be ODOT pre-qualified for highway construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis