Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a new two-story commercial building, site preparation; erosion and sediment control; utility connections and underground services; grading and drainage improvements; concrete foundations and auger-cast piles; structural framing; exterior envelope systems; windows and doors; interior build-out; mechanical, electrical, and plumbing systems; and all associated civil, architectural, and structural work required for a complete and operational commercial building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of demolition of existing classroom building, construction of a new 4 classroom building with associated site work and ADA improvements.
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
Work consists of demolition of existing classroom building, construction of a new 4 classroom building with associated site work and ADA improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new town hall building and septic.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Construction of a new town hall building and septic.
AvailableWork consists of New construction of a wood framed and structural steel building on a concrete slab foundation with exterior stucco, weather barrier, storefront windows systems, decorative exterior tiling, hollow metal doors & frames, metal roof panels and TPO roof system at the mechanical well with stand alone structural steel canopy systems with metal roof and soffit panels adjacent to the building. The interior building components include electrical, data, fire alarm, HVAC, air balance, plumbing, drywall, insulation, FRP, paint, casework and countertops, acoustical t-bar ceilings, carpet & LVP flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, site concrete, asphalt paving, handrails & guardrails, fencing & gates, landscaping & irrigation, site striping, survey, and erosion control.
Posted Date
Jan 8, 2026
Due Date
Jan 28, 2026
Release: Jan 8, 2026
Close: Jan 28, 2026
Work consists of New construction of a wood framed and structural steel building on a concrete slab foundation with exterior stucco, weather barrier, storefront windows systems, decorative exterior tiling, hollow metal doors & frames, metal roof panels and TPO roof system at the mechanical well with stand alone structural steel canopy systems with metal roof and soffit panels adjacent to the building. The interior building components include electrical, data, fire alarm, HVAC, air balance, plumbing, drywall, insulation, FRP, paint, casework and countertops, acoustical t-bar ceilings, carpet & LVP flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, site concrete, asphalt paving, handrails & guardrails, fencing & gates, landscaping & irrigation, site striping, survey, and erosion control.
AvailableNew Construction of the Branch Library Building.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
New Construction of the Branch Library Building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →