CountyMO
Posted
-
Nov 30, 2026
Constructing Bridge - 13800051 BRO-R085(001)
Work includes the removal of the existing structure and construction of a new 98'-0" single span bridge with prestressed concrete nu-43 girders, a cast-in-place concrete deck on prestressed concrete panels, concrete abutments on 3'-0" drilled shafts with 2'-6" rock sockets, w-beam railing, traffic control, and other required appurtenances.
