Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to replace two hot water boilers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Ohio Department of Rehabilitation and Correction (ODRC) is soliciting quotes to replace two hot water boilers at the Bennett Cooper Reentry Center (BCRC) in Dayton, Ohio, including delivery, installation, removal of old boilers, and demolition of two on-site cubicles. A mandatory pre-bid/site visit is scheduled for January 21, 2026; bidders must be registered in the OhioBuys Supplier Portal and submit quotes for parts, labor, and installation. The estimated budget range is roughly $50,000–$200,000 and the solicitation is a Request for Quotation (RFQ) with award based on quotes submitted through the official OhioBuys posting.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 30, 2026
The Ohio Department of Rehabilitation and Correction (ODRC) is soliciting quotes to replace two hot water boilers at the Bennett Cooper Reentry Center (BCRC) in Dayton, Ohio, including delivery, installation, removal of old boilers, and demolition of two on-site cubicles. A mandatory pre-bid/site visit is scheduled for January 21, 2026; bidders must be registered in the OhioBuys Supplier Portal and submit quotes for parts, labor, and installation. The estimated budget range is roughly $50,000–$200,000 and the solicitation is a Request for Quotation (RFQ) with award based on quotes submitted through the official OhioBuys posting.
AvailableProvide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 2, 2026
Release: Jan 21, 2026
Close: Feb 2, 2026
Provide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
AvailableReplace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
Posted Date
Nov 5, 2025
Due Date
Jan 26, 2026
Release: Nov 5, 2025
Close: Jan 26, 2026
Replace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.
Posted Date
Jan 9, 2026
Due Date
Jan 29, 2026
Release: Jan 9, 2026
Close: Jan 29, 2026
The project consists of the removal and replacement of the condensing boilers serving the Event Center Building. (4) existing condensing boilers are to be removed and replaced with (3) 5000 MBH boilers and (1) 2000 MBH boiler. Existing boiler pumps, system pumps, expansion tanks, and air separators are to be removed and replaced. Temperature controls to be updated to serve this new equipment.