Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide professional engineering services from qualified professional engineers demonstrating their qualifications for planning, design, bidding, and construction management for the construction of a 7.5 mg clearwell.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work contract of repair of the underground clearwell water storage tank.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work contract of repair of the underground clearwell water storage tank.
AvailablePremium
Access the largest public sector contact database
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
This RFP is for the repair of the underground clearwell water storage tank at Water Treatment Plant (WTP) #3.
AvailableWork includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
Posted Date
Dec 3, 2025
Due Date
Jan 28, 2026
Release: Dec 3, 2025
Close: Jan 28, 2026
Work includes approx. 3 EA 5-million-gallon clearwell demolition; 1 EA west flume junction box (area 96) installation; 2 EA mechanical bulkhead installation (temporary); 1 EA contingency structure (structure 97) modification; 1 EA manual slide gate installation; 84" piping installation (lump sum); 12" pipe and diffusion nozzle installation; 84" cast-in-place concrete buoyancy collars; and 69. 5 HA area grading, hydroseeding, and sodding.
AvailableDemolition of structural items, access hatches and curbs, equipment pad, abandoned piping and chemical feed piping. Construction of new wall inside transfer clearwell inlet box. Installation of new new curbs and access hatches. Installation of new ladder. Installation of new chemical feed lines.
Posted Date
Nov 19, 2025
Due Date
Jan 15, 2026
Release: Nov 19, 2025
Close: Jan 15, 2026
Demolition of structural items, access hatches and curbs, equipment pad, abandoned piping and chemical feed piping. Construction of new wall inside transfer clearwell inlet box. Installation of new new curbs and access hatches. Installation of new ladder. Installation of new chemical feed lines.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis