Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Department of Veterans Affairs (James H. Quillen VA Medical Center) issued a presolicitation for Project 621-23-104 to relocate the Police Dispatch facility, including site preparation, demolition/removal of existing structures, and furnishing labor and materials per drawings and SOW. The procurement is for construction (NAICS 236220), is a 100% SDVOSB set-aside, estimated between $1,000,000 and $2,000,000, with a 365-calendar-day period of performance. The notice is a presolicitation (sealed bidding per FAR 14.101), posted on SAM.gov and anticipated solicitation release around 12 December 2025.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Posted Date
Nov 6, 2025
Due Date
Jan 5, 2026
Release: Nov 6, 2025
Close: Jan 5, 2026
Premium
Access the largest public sector contact database
The project to replace the end of lifecycle chillers at buildings 1, 2 and 104 shall include the following: The project shall replace the standby chiller located on the roof of building 1 above the kitchen. Replace building 2 chillers 1 and 2, modifications to chilled water piping in basement to utilize campus chilled water as backup and remove chiller 3. Replace building 104 operating room backup chiller and relocate to roof of building 104, to include additional piping to relocate chiller to roof. See attached file.
Accommodate a fully functional emergency dispatch backup center at water treatment plant.
Posted Date
-
Due Date
Dec 30, 2025
Release: -
Close: Dec 30, 2025
Accommodate a fully functional emergency dispatch backup center at water treatment plant.
AvailableAccommodate a fully functional emergency dispatch backup center at water treatment plant.
Posted Date
-
Due Date
Dec 30, 2025
Release: -
Close: Dec 30, 2025
Accommodate a fully functional emergency dispatch backup center at water treatment plant.
AvailableProvide marine patrol dispatch contract workers.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide marine patrol dispatch contract workers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis