Minnesota State University Mankato
Higher EducationMN
Posted
-
Dec 4, 2026
MANK-27-MF Divider Curtains RFP
Project Scope: The current Gymnasium Divider Curtains were installed in 2000. They have exceeded their expected life and have started to fail. This project will remove the existing curtains, operating hardware, and motors and replace with new gym divider curtains. The curtains that are scheduled to be replaced include the two round sections and the two straight sections of curtains that align with the inside edge of the track. It will also include the three court divider curtains. The curtain system should be replaced to match the existing design of the dividers including layout, materials operation, and motor locations. We will be adding curtain locks to all sections of the curtain. Contractor shall provide floor protection for areas that lifts will be operated on. Protection shall consist of a slip sheet, and 2 layers of ¾” plywood. Prevailing wage rates will be required on this project. The project will be constructed in one phase. Minnesota State will hold a VOLUNTARY In-Person informational meeting on Tuesday November 24, at 9:00 am, at Myers Field House Conference room 129 – visitor paid parking will be available in Lot 4 on the corner of South Road and Ellis Avenue, just South of the Student Union. Link to parking information: https://mankato.mnsu.edu/about-the-university/maps-and-transportation/parking/parking-and-traffic-guidelines/visitor-parking/
