Summary
The City of Winnipeg is seeking consulting engineering services for the detailed design of an electrical distribution system upgrade at 510 Main Street, covering the 600V/Distribution B (Administration Building), the 120/208 Distribution A (Council Building), and infrastructure for power factor correction capacitors. The RFP scope includes pre-design, schematic design, design and specification development, contract document preparation, procurement process support, contract administration, and post-construction services, with target project delivery by September 15, 2026. The solicitation was published on July 2, 2026 with a closing date of July 30, 2026, and an optional onsite visit scheduled for July 21, 2026.