Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kansas Department of Transportation
Grading, bridge and surfacing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Fillmore County
Bridge replacement with culvert, approach grading & aggregate surfacing.
Posted Date
Nov 10, 2025
Due Date
Dec 8, 2025
Release: Nov 10, 2025
Fillmore County
Close: Dec 8, 2025
Bridge replacement with culvert, approach grading & aggregate surfacing.
AvailableSt. Louis County
Work includes 54 LF sawing bituminous pavement (full depth); 458 LF salvage guardrail; 1,562 CY excavation - common (p); 581 CY select granular embankment (cv) (p); 40 CY aggregate surfacing (cv) class 5 (p); 447 CY aggregate base (cv) class 5 (p); 54 LF 12x7 precast concrete box culvert; 122 cy coarse aggregate bedding (cv) (p); 826 CY culvert excavation class u (p); 630 CY random riprap class iii; 316 CY common topsoil borrow; 0.78 acre seeding; 900 LF 6" solid line paint.
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
St. Louis County
Close: Dec 4, 2025
Work includes 54 LF sawing bituminous pavement (full depth); 458 LF salvage guardrail; 1,562 CY excavation - common (p); 581 CY select granular embankment (cv) (p); 40 CY aggregate surfacing (cv) class 5 (p); 447 CY aggregate base (cv) class 5 (p); 54 LF 12x7 precast concrete box culvert; 122 cy coarse aggregate bedding (cv) (p); 826 CY culvert excavation class u (p); 630 CY random riprap class iii; 316 CY common topsoil borrow; 0.78 acre seeding; 900 LF 6" solid line paint.
AvailableOsage County
Box bridge construct a 30βx 10β x 45β- 6β R.F.B. Roadway: 26β-0β Roadway, 0 Deg. Skew 1,742 CY Common Excavation (Contractor Furnished) 526 Tons Surfacing Material (AB-3).
Posted Date
Nov 13, 2025
Due Date
Dec 3, 2025
Release: Nov 13, 2025
Osage County
Close: Dec 3, 2025
Box bridge construct a 30βx 10β x 45β- 6β R.F.B. Roadway: 26β-0β Roadway, 0 Deg. Skew 1,742 CY Common Excavation (Contractor Furnished) 526 Tons Surfacing Material (AB-3).
AvailableCalifornia Department of Transportation
Work consists of remove ac surfacing, hma (bridge) and crack treatment, includes 3,480 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 6,931 LF of crack treatment; 1,543 TON of hot mix asphalt (bridge); 7 TON of tack coat; 231,877 SF of remove asphalt concrete surfacing; 13,900 LF of remove thermoplastic traffic stripe; 6,950 LF of 6" traffic stripe tape; 10,500 LF of 6" traffic stripe tape. See attached files.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
California Department of Transportation
Close: Nov 20, 2025
Work consists of remove ac surfacing, hma (bridge) and crack treatment, includes 3,480 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 6,931 LF of crack treatment; 1,543 TON of hot mix asphalt (bridge); 7 TON of tack coat; 231,877 SF of remove asphalt concrete surfacing; 13,900 LF of remove thermoplastic traffic stripe; 6,950 LF of 6" traffic stripe tape; 10,500 LF of 6" traffic stripe tape. See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis