Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of operational sanitizer to maintain habitability and sanitary conditions.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide dockside repairs onboard uscgc tahoma.
Posted Date
Jan 22, 2026
Due Date
Feb 13, 2026
Release: Jan 22, 2026
Close: Feb 13, 2026
Provide dockside repairs onboard uscgc tahoma.
AvailablePerform Dockside repairs to the U.S. Coast Guard Cutter USCGC KUKUI (WLB 203) FY26 Dockside.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Perform Dockside repairs to the U.S. Coast Guard Cutter USCGC KUKUI (WLB 203) FY26 Dockside.
AvailableThis is a combined synopsis/solicitation for the maintenance and inspection of the Hi-Fog Water Mist Fire Suppression System aboard the USCGC Mobile Bay in Sturgeon Bay, WI. The contractor must be certified to perform setup, testing, and restoration of the system, including a 5-year inspection and replacement of specific parts like filters and valves. The period of performance is scheduled for March 9–13, 2026, and the opportunity is set aside for small businesses.
Posted Date
Jan 30, 2026
Due Date
Feb 9, 2026
Release: Jan 30, 2026
Close: Feb 9, 2026
This is a combined synopsis/solicitation for the maintenance and inspection of the Hi-Fog Water Mist Fire Suppression System aboard the USCGC Mobile Bay in Sturgeon Bay, WI. The contractor must be certified to perform setup, testing, and restoration of the system, including a 5-year inspection and replacement of specific parts like filters and valves. The period of performance is scheduled for March 9–13, 2026, and the opportunity is set aside for small businesses.
AvailableThe U.S. Coast Guard is soliciting quotes for the 5-year inspection and maintenance of the Hi-Fog Water Mist Fire Suppression System aboard the USCGC Mobile Bay. The scope of work includes testing the system, replacing specified filters and valves, and returning the system to normal operation. The work is scheduled to take place from March 9 to March 13, 2026, at the vessel's location in Sturgeon Bay, Wisconsin.
Posted Date
Jan 30, 2026
Due Date
Feb 9, 2026
Release: Jan 30, 2026
Close: Feb 9, 2026
The U.S. Coast Guard is soliciting quotes for the 5-year inspection and maintenance of the Hi-Fog Water Mist Fire Suppression System aboard the USCGC Mobile Bay. The scope of work includes testing the system, replacing specified filters and valves, and returning the system to normal operation. The work is scheduled to take place from March 9 to March 13, 2026, at the vessel's location in Sturgeon Bay, Wisconsin.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis