StateMI
Posted
-
Nov 25, 2026
472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd RFP
The State of Michigan is soliciting qualified contractors to replace the existing water-softening system at the Lakeland Correctional Facility and to install an additional reverse-osmosis system in the power-plant basement. The work includes demolition of the current softener, installation of new equipment, associated plumbing, electrical, and control work, as well as related site work such as fill, grading, and erosion-control measures. The contract will be awarded to the low bidder who can meet the 36-week substantial-completion schedule and provide the required performance and payment bonds.
