Summary
Seeking licensed HVAC contractors to supply, install, and commission up to three (3) new 4-ton commercial rooftop packaged heat pump units. Site Preparation: Safe recovery and legal disposal of the existing equipment and refrigerant per EPA guidelines. Curb Transition: Supply and installation of a custom curb adapter to seamlessly mate each new 4-ton unit to the existing roof curbs. Rigging: Provide all crane services, rigging equipment, safety signaling, and necessary local permits for the Keystone Heights site. Installation: Complete all final electrical connections, low-voltage control wiring for the Wi-Fi thermostats, duct transitions, and condensate drain lines. Commissioning: Perform full system startup, test all stages of heating/cooling/auxiliary heat, verify Wi-Fi connectivity, and provide a certified startup report to the owner. All other activities to deliver fully functional system/systems.