Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of improvements to the existing pretreatment building including replacement of screening equipment, grit equipment, pumps and blowers (including vfds), influent sampler(s), flow meter(s), gates and valves, and associated piping along with renovation of existing pre-engineered metal building (including hvac improvements), installation of new bollards, and electrical improvements; See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work consist of approx 1 LS mobilization; 1 LS erosion control; 1 LS demolition; 1 LS bypass pumping; 1 LS influent ps improvements (bypass connection, magnetic flow meter, hatch, pump guide rails, and piping & fittings); 1 LS installation of ecofixe/ biofixe modules; 1 LS flow splitter box; 2 EA 30 hp blowers; 1 LS replace effluent ultrasonic flowmeter on existing parshall flume; 1 LS headworks - rotary drum type; 1 LS ecofixe and biofixe modules (materials and startup); 49 SY containment pad; 20 SY equipment pad; 1 LS pole barn; 1 EA paa tank and appurtenances; 1 LS chemical metering skid, piping, and appurtenances. See attached file.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Premium
Access the largest public sector contact database
The work consist of approx 1 LS mobilization; 1 LS erosion control; 1 LS demolition; 1 LS bypass pumping; 1 LS influent ps improvements (bypass connection, magnetic flow meter, hatch, pump guide rails, and piping & fittings); 1 LS installation of ecofixe/ biofixe modules; 1 LS flow splitter box; 2 EA 30 hp blowers; 1 LS replace effluent ultrasonic flowmeter on existing parshall flume; 1 LS headworks - rotary drum type; 1 LS ecofixe and biofixe modules (materials and startup); 49 SY containment pad; 20 SY equipment pad; 1 LS pole barn; 1 EA paa tank and appurtenances; 1 LS chemical metering skid, piping, and appurtenances. See attached file.
AvailableRelocation of 0.12 MGD Steel Package Wastewater Treatment Plant, Construction of Access Road, Site and Electrical Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Relocation of 0.12 MGD Steel Package Wastewater Treatment Plant, Construction of Access Road, Site and Electrical Improvements.
AvailableWWTP process, disinfection and electrical improvements, Phase II.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
WWTP process, disinfection and electrical improvements, Phase II.
AvailableProject consists o excavation, site preparation, backfill, buried piping, storm drain piping and basins, miscellaneous metals and concrete pipe supports. Excludes: process equipment and above-ground process piping.
Posted Date
Oct 25, 2025
Due Date
Dec 18, 2025
Release: Oct 25, 2025
Close: Dec 18, 2025
Project consists o excavation, site preparation, backfill, buried piping, storm drain piping and basins, miscellaneous metals and concrete pipe supports. Excludes: process equipment and above-ground process piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis