Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
In general, the work consists of: interior renovation to 9,175 SF on the third and fifth floors. Demolition of drywall partitions with doors and hollow metal frames, removal and reinstallation of plastic laminate casework with modifications, and acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project consists of approximately 46,000 SF of first generation upfit space on the 5th floor of the county courthouse. The project includes courtrooms, office and support spaces, and the following building systems or components: mechanical, electrical, plumbing, fire protection, IT, Audio Visual and Security. Fire alarm upgrades will be performed on all other floors.
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
The project consists of approximately 46,000 SF of first generation upfit space on the 5th floor of the county courthouse. The project includes courtrooms, office and support spaces, and the following building systems or components: mechanical, electrical, plumbing, fire protection, IT, Audio Visual and Security. Fire alarm upgrades will be performed on all other floors.
AvailableSupplies, transportation, and disposal as necessary to complete the construction of administration building space reconfiguration 5th floor dispatch center. interior improvements to a 1,200 SF area on the 5th floor, specifically outside corridor 503, extending from the server room (Room 592) to Room 590. Enhancements will include adjustments to the existing modular workstation panels at the entry, ensuring accessibility compliance and flexible use within the space. The project will also feature new suspended acoustic ceilings, LED dimmable lighting fixtures with controls throughout, and updated ceiling diffusers and grills in the conference room, while keeping the existing Mini Splits intact in the dispatch and office areas. Additionally, the scope includes painting finishes for the existing perimeter and interior doors, along with carpet replacement.
Posted Date
Dec 17, 2025
Due Date
Feb 11, 2026
The Project consists of a remodeling project replacing ACT system, lights, and coordinating with existing sprinklers, HVAC, low voltage systems. There is remodeling in the media center creating 5 classrooms. In the pool room there is patching of failing tile, new lights, acoustic panels, and painting the ceiling.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
The Project consists of a remodeling project replacing ACT system, lights, and coordinating with existing sprinklers, HVAC, low voltage systems. There is remodeling in the media center creating 5 classrooms. In the pool room there is patching of failing tile, new lights, acoustic panels, and painting the ceiling.
AvailableThis solicitation requests contractors to perform mechanical, electrical, and plumbing renovations for the 5th and 6th floors of Wescoe Pavilion B at the University of Kansas Medical Center (KUMC). The procurement is a public construction solicitation administered through the State of Kansas Department of Administration’s planroom and is not a grant. Bidding opened on 2026-01-14 and closes on 2026-02-17; full contract documents require planroom registration to access.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
This solicitation requests contractors to perform mechanical, electrical, and plumbing renovations for the 5th and 6th floors of Wescoe Pavilion B at the University of Kansas Medical Center (KUMC). The procurement is a public construction solicitation administered through the State of Kansas Department of Administration’s planroom and is not a grant. Bidding opened on 2026-01-14 and closes on 2026-02-17; full contract documents require planroom registration to access.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supplies, transportation, and disposal as necessary to complete the construction of administration building space reconfiguration 5th floor dispatch center. interior improvements to a 1,200 SF area on the 5th floor, specifically outside corridor 503, extending from the server room (Room 592) to Room 590. Enhancements will include adjustments to the existing modular workstation panels at the entry, ensuring accessibility compliance and flexible use within the space. The project will also feature new suspended acoustic ceilings, LED dimmable lighting fixtures with controls throughout, and updated ceiling diffusers and grills in the conference room, while keeping the existing Mini Splits intact in the dispatch and office areas. Additionally, the scope includes painting finishes for the existing perimeter and interior doors, along with carpet replacement.
Available