Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The District will construct: Approx. 2,300 LF of 6" PVC waterline; Approx. 90 LF of 12” bored steel conduit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
Close: Dec 17, 2025
The City of Huntsville is seeking bids for the construction of the 11th Street and Hickory Drive Waterline Rehabilitation project, which includes the installation of approximately 3,500 LF of 12" PVC waterline and 7,400 LF of 8" PVC waterline, along with reconnection and relocation of existing water services and fire hydrants.
Premium
Access the largest public sector contact database
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Work includes 6 EA furnish, install and move to active project area - project information sign; 1 LS traffic control, including but not limited to signage, control devices, temporary drainage, paving; 1 LS swppp, complete in place including reports; 7,389 LF trench safety system; 1 LS tree and plant protection; 1 AC clearing and grubbing; 5,359 SY roadway pavement removal and replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade; 84 SY sidewalk pavement removal and replacement; 70 SF removal and replacement concrete wheelchair ramp including headers, dowels expansion joints, staining and truncated dome pavers. See attached file.
AvailableThe project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
The project consist of approx 7,389 LF complete in place trench safety system; 5,359 SY Roadway Pavement Removal and Replacement, all pavement materials, thicknesses, gutters, curbs, sidewalk curb, subgrade, and etc. Replace to match existing, and in accordance with construction specifications and details, complete in place; 84 SY Sidewalk Pavement Removal and Replacement, complete in place; 2,433 LF 12" waterline via open cut; 581 LF 8" waterline in steel casing by trenchless construction.
AvailableAbandon and relocate an existing 6-inch waterline crossing; Tie into the existing 8-inch main on Laurel Street; Extend across the southern boundary of the Murphy Gas Station property; This alignment will eliminate the vertical conflict with the storm drain, allow abandonment of the existing 6-inch line, and maintain service to adjacent properties, including re-supply to an existing fire hydrant. The proposed waterline will be approx. 490 LF in length and installed at a depth of 5 feet or shallower.
Posted Date
Nov 29, 2025
Due Date
Dec 15, 2025
Release: Nov 29, 2025
Close: Dec 15, 2025
Abandon and relocate an existing 6-inch waterline crossing; Tie into the existing 8-inch main on Laurel Street; Extend across the southern boundary of the Murphy Gas Station property; This alignment will eliminate the vertical conflict with the storm drain, allow abandonment of the existing 6-inch line, and maintain service to adjacent properties, including re-supply to an existing fire hydrant. The proposed waterline will be approx. 490 LF in length and installed at a depth of 5 feet or shallower.